Project files for the Lyons VA Bathroom Project


** If you have any questions, or comments, please
call Michael @ 914-269-4343 ext 22, or e-mail
(preffered) at michael@nordstromcontracting.com


Project Drawings: ***REMOVED ORIGINAL DRAWINGS- REPLACED WITH REVISED BELOW
  • Architectural- Also Includes Exhaust Fans, and existing Fire Alarm Locations Mechanical
    and Electrical Plans Plumbing Plans Full combined set

Specifications:


      ** When RFIs are answered, the answers will be posted.



  • AMENDMENT 2- POSTED 2-17-2017- SEE REVISED Drawings

-- Answers to RFI's

--Revised Drawings
      
Revised Architectural Drawings
      Revised Electrical Drawings
      Revised Plumbing Drawings


** Please check back for updates


Specific Trade Packages- Includes all relevent documents

FLOORING PACKAGE- Includes Drawings, Specifications, and finish schedule
PAGE LAST UPDATED 2/2/2016
@12PM